PLANNING SERVICES

 

All wind turbines, and some Photo Voltaic system installations will require planning permission before they are permitted to be installed. They will also require permission from the customers Distribution Network Operator 'DNO' to be allowed to connect their renewable energy generator to the National Grid.

RBB Electrical has an in house team with a high success rate to deal with these issues in a professional manner to ensure the positive results required for your renewable energy installation.

 RBB ELECTRICAL   

RENEWABLE ENERGY SPECIALISTS